NASA’s full Artemis plan revealed
It is a bold plan. It puts man back on the moon in 5 years and for long stays this time.
I don't see the need for the Lunar Gateway- it seems to be an unnecessary step. But at least they are moving forward.In the nearly two months since Vice President Mike Pence directed NASA to return to the Moon by 2024, space agency engineers have been working to put together a plan that leverages existing technology, large projects nearing completion, and commercial rockets to bring this about.
Last week, an updated plan that demonstrated a human landing in 2024, annual sorties to the lunar surface thereafter, and the beginning of a Moon base by 2028, began circulating within the agency. A graphic, shown below, provides information about each of the major launches needed to construct a small Lunar Gateway, stage elements of a lunar lander there, fly crews to the Moon and back, and conduct refueling missions.
This decade-long plan, which entails 37 launches of private and NASA rockets, as well as a mix of robotic and human landers, culminates with a "Lunar Surface Asset Deployment" in 2028, likely the beginning of a surface outpost for long-duration crew stays. Developed by the agency's senior human spaceflight manager, Bill Gerstenmaier, this plan is everything Pence asked for—an urgent human return, a Moon base, a mix of existing and new contractors.